2500L Brewery Equipment Project Smoothly Being Shipped to Europe

2500L brewery equipment

Project: 2500LĀ  Brewery Equipment
Location: Europe

Recently, we have completed and shipped a 2500L brewery system, which will soon be installed at our customer’s brewery in Europe.

At present, the equipment is being transported by sea. I would like to take this opportunity to share some photos of this system taken at our factory. Hopefully, they can provide you with some useful ideas and references for your future brewery construction or expansion plans.

Equipment Configuration of the 2500L Brewery Equipment:

Part 1: Malt Milling Unit of 2500L Brewery Equipment

2500L Brewery Equipment

Part 2: 25HL Brewhouse
(5-vessel brewhouse + 75HL HLT + 75HL CLT)

2500L brewery equipment

2. Brewhouse

2500L Brewery Equipment

4. Brewhouse

Part 3: Fermentation Unit

fermenter

5. Fermenters

Part 4: Glycol Cooling Unit

10. Water Tank Glycol Tank

9. Chillers

Part 5: Electrical Control Unit

control 2

Part 6: Portable CIP Cart

11. CIP

Part 7: All related spare parts and basic brewery tools

PARTS 1

PARTS 2

Part 8: Keg Filling & Washing Unit

Washing

Part 11: Steam Supply Unit

7. Steam Boilers

Part 12: Air Supply Unit

Air

Part 13: Water Supply Unit

8. Water Treatment

Part 14: Spent Grain Handling Unit

spent

This brewing system is designed for 1–10 batches per day based on a 24-hour operation schedule. The maximum annual production capacity can reach approximately 75,000HL.

At present, we are also working closely with our customer on their future brewery expansion plan, including:

Phase 2: Adding more fermentation tanks to increase production capacity.

Phase 3: Optimizing the brewery pipeline system and adding membrane filtration equipment to further improve production efficiency and beer quality.

Phase 4: Adding a Nitrogen Generation System for CO2 Cost Optimization

We hope this project can provide you with some inspiration and useful references when planning your own brewery development.

If you have any questions or want to know more details about our brewery equipment, please do not hesitate to reach out with us.

Edited by Damon

Sales Engineer

Email:[email protected]

Get A Quote

If you have other questions, please do not hesitate to leave your email address below, we are pretty happy to contact you soonest!

Contact Form Demo

FAQ

Do you offer installation and training services?

Yes, we provide professional installation guidance and on-site training. Our team of nearly 20 experienced installation engineers and brewmasters will ensure your equipment is correctly installed and operating smoothly, maximizing your success from start-up.

Certainly. Please share your floor plan with us, and our technical team will be glad to design a tailored equipment layout based on your specific requirements and space constraints.
We offer the following warranty coverage: – 5 years on the tank body under normal operating conditions. – 1 year on all accessories and auxiliary facilities. – 3 months on wearing parts and sensitive components, such as pump seals, gaskets, and sensors.
Scroll to Top